Job costing while the job is still running

Month-end is a post-mortem, not a decision

By the time most hire businesses know what a job cost, the job is finished, the machines are somewhere else and the client's invoice is already being argued about. The number is accurate and useless — it tells you what happened, not what to do.

Live job costing moves that number to the point where it is still worth acting on: the second week of a six-week job, while there is still time to re-quote, re-allocate or have the conversation.

What belongs on the job

A job cost is only as good as what gets attached to it. For plant hire, that means four things land on the job rather than somewhere nearby:

  • Machine time — which machine, on which job, for how long. That comes straight from the allocation, not from a timesheet filled in on Friday.
  • Crew time — the operator who ran it, costed against the same job.
  • Attachments and photos — the fuel docket, the delivery note, the photo of the trench that was not on the scope.
  • Signed dockets — the proof of what was actually done, filed against the job the moment it is signed.

When those four live on the job, the cost of the job is already there. Nobody has to reconstruct it.

What changes when the cost is live

The difference is not reporting. It is the questions you can ask on a Tuesday:

  • This job is three weeks in and already past what we quoted — what changed?
  • This machine has been on site longer than the booking — do we extend, or re-allocate?
  • This client keeps adding small variations — are we billing them?

Every one of those is a decision, and every one of them costs money by the following week.

The end of the month gets easier too

When the invoice comes to be written, the work is already in front of whoever approves it: the dockets are signed, the attachments are on the job, the hours came from the allocation rather than a memory. The invoice goes out sooner, and the questions come back to a record instead of a folder.

That is the version of Project tracking inside Trakhire — allocation and job costing in the same system, so the two numbers cannot drift apart.

Start with one job

You do not need to move everything at once. Pick the job that is about to make money or lose it, talk to us, and we will show you what its cost looks like on the board while it is still running.

See it on your own machines

If any of this sounds like your week, we will show you the same job running on Trakhire.

Book a demo

Trakhire

Cloud-based ERP for plant hire teams. Plan it, track it, done.

[email protected]

© Trakhire

Product

The allocation boardHow it worksUse casesPricingBlog

Company

Book a demoContactLog in

Get the app

Google PlayApp StoreFacebookInstagram